Your Trusted HDD Contractor

Based in Inverness county, serving the maritimes. We are specialized in HDD and also offer a range of supporting services such as trenchless pipe bursting, excavation, HDPE pipe fusing, pipe fitting, and commissioning of new utilities. Whether you are a contractor looking for assistance with a difficult crossing, engineered project specifying trenchless installation on your project, or a customer looking for turn key service, we have what you need.

About

Committed to Excellence

Since entering the business in 2021, we've focused on providing high quality Horizontal Directional Drilling services in a safe and efficient manner. By consistently training, adding equipment, upgrading our tooling to tackle larger diameter/longer bores in difficult ground conditions we've quickly grown. We have completed multiple complex HDD projects along with many routine applications. Each with great outcomes and satisfied customers. This is the result of strategic planning, proper equipment, trained personnel, and most importantly the ability to problem solve through unforeseen difficulties that we often encounter on HDD projects. Contact us today and let's get started on your project.

1A94800C-196C-45D7-98ED-C5B995D7E8EB.png
Home: About
Untitled

Services

Quality Work at Competitive Rates

We've committed to providing a wide range of services in a niche market. Each service we offer is a complement to our core service, HDD. All are performed by trained professionals and competent equipment. Horizontal directional drilling is not just for large construction project's, general contractors or municipalities. We install anything from a 19mm water service under a residential customers lawn to large or sidewalk to large diameter waterman's under water body and highways.

Contact
Home: Services
Untitled

Pipe work and commissioning

Although the majority of our work is for contractors who perform pipe tie-ins, pressure testing, chlorination, we are well equipped to handle this also. Especially if the customer is interested in a full HDPE conversion.

Get in Touch
Untitled

HDPE PIPE FUSING

The pipe of choice for Direction Drilling in our region is HDPE. It is a fusible polyethylene product available in all common sizes, and pressure ratings you require. When properly spec'd we can install a fully monolithic HDPE system with no mechanical fittings burried, a huge advantage in our highly corrosive soils. WMDD can provide the pipe/pipe work along with fusing by certified fusing technicians.

Get in Touch
Untitled

Excavation

Excavation is part of any HDD project. Big or small, we provide it. Like the rest of our services, it is performed by a competent professional operator with safety and productivity in mind.

Get in Touch
Untitled

Horizontal Directional Drilling

This our core service and we are fully equipped with state of the art guidance systems and drill rigs to handle anything from a 19mm water service to a 500mm casing with distances up to 300 meters. If you have a conduit that you want installed but don't want or simply don't have the option to dig, HDD is likely the best option. Water, sewer, drainage, fibre op, electrical are all common applications. Unlike competitors WMDD's all-in approach to HDD means that your project is our #1 concern and will receive undivided professional attention until complete.

Get in Touch
Untitled

Get a Quote

Fair Prices, Excellent Service

Contact us for a quote.

Thanks for submitting! We’ll send you a price quote soon.

Home: Get a Quote
Untitled

Portfolio

Our Recent Work

Home: Projects
Untitled

Shortts Lake Water Intake

September 29th, 2022

Our client for this particular project was interested something economically and environmentally sustainable. The task was to install a water intake 50 meters off shore in a minimum water depth of 4 meters. The permitting process took months, however the project itself was successfully completed in 1 day.

Get in Touch
Untitled

Eskasoni Sanitary Sewer and Water

January, 2023

Subcontracted by Northern Contractor's Limited we were tasked with installing new sewer and water mains out of harms way. Construction of a new bridge on John Paul Lane, Eskasoni. Despite some unforeseen difficulties, this particular project was completed on time and within budget allowing NCL to move forward with the bridge construction.

Get in Touch
A26CE2FF-F3E1-4184-B8E9-A5C9F13197B8.jpeg

Highway 105 Conduits

February/March 2023

Drilling under Trans-Canada Highway 105 and installing 2x100mm HDPE conduits at multiple locations in ground conditions consisting of clay, sandy gravel, cobble, and sandstone. This work kicked off in early February. Adding winter temperatures and snow to the equation does not make drilling any easier. However, with proper planning and winter drilling procedures in place it is simply another part of puzzle. WMDD completed this work on time and budget despite snow storms, cold temperatures, multiple encounters with rock and boulders. 

Untitled

Pictou County 200mm watermain

Fall 2023

On this project we completed 9 200mm watermain installations. This included pipe fusing, excavation and HDD. These crossed a combination highways and waterways spec'd to be installed by HDD. We encountered many difficult ground conditions often within the same bore but due to our stock of reamers and drilling fluids we were able to select a combination for each specific ground condition we were able to install all required bores with what could be considered an undersized drill rig for these conditions. We have since added a larger rig but completing these bores with our JT2020 is a testament to our abilities. These went so well we wound up converting more sections to be drilled at then general contractors request.

Untitled

DNA Highway electrical conduit installation

June 2023

On this project we were tasked with the supply and installation of 4 x 100mm HDPE conduit to be used as electrical conduit. If you've driven on this highway you can imagine the ground conditions we drilled through with no complications. To get an idea of time to complete projects like this we spent 1 day on site fusing/staging our pipe, and establishing a traffic plan with the contractor. The following day we mobilized the drilling equipment, completed the bore, packed up and moved out all in the same day. 

Get in Touch
Untitled

Sewer lateral pipe bursting

October, 2023

The client for this particular project was interested something economically and environmentally suitable. There was a building over top of the existing pipe so a trench was not an option. By pipe bursting the existing collapsed asbestos concrete sewer lateral under the existing building we were able to turn what would have been a huge project into a day long affair with the help of another local contractor handling the excavation and tie-ins.